Home

Progetto

Disseminazone

Calendario

Elaborati del progetto

Links

TOOL


DELIVERABLES

Gantt diagram


NAME OF THE DELIVERABLE

NÂș ACTION

DEADLINE

OUTCOME

STATUS

AUTHOR

LINKS

D.E.1.1 Consortium Agreement and Meeting Calendar 

E 1 

31/08/2014 

20/12/2014

DONE

 ALL

 

D.D.3.1. Notice Board ( beginning of the project) 

D 3 

30/09/2014 

30/10/2014

DONE

AITEX

 D_D_3_1 Notice Board_PHOTOCITYTEX-1.pdf

D.D.2.1 Website of the project (September 2014.Maintenance all the project) 

D 2 

30/09/2014 

20/09/2014

DONE

CEAM

 D_D_2_1_WEBPAGE.pdf

D.D.2.2 Information about the project in each Partner website (September 2014. Maintenance all the project) 

D 2 

30/09/2014 

10/01/2015

DONE

ALL

 

D.A.1.1. Technical report: compilation of technical data sheets of photoactive additives and building materials, not exclusively products in textile format 

A 1 

31/10/2014 

13/11/2014

DONE

NTT
AITEX

 Confidential, only for the members of the Consortium (including the Commission Services)

D.A.1.2. Technical report: European air quality condition, concentration of pollutants data (tables and graphs) and main conclusions. 

A 1 

31/10/2014 

15/11/2014

DONE

CEAM
LEGAMBIENTE

 Confidential, only for the members of the Consortium (including the Commission Services)

D.B.2.1.Technical data sheet of photocatalytic textile structures to be implemented in purifying polluted atmospheres 

B 2 

31/10/2014 

07/01/2015

DONE

NTT
AITEX

Confidential, only for the members of the Consortium (including the Commission Services)

D.B.1.1 First results of the air measurement (Six months reports with the first results of the air measurements (chemical speciation, concentration profiles, etc.) 

B 1 

31/12/2014 

15-03/2015

DONE

CEAM

 

D.E.2.1: Database with some information of the main LIFE project which have relation with thisproject (carried out during the project andupdated continuously) 

E 2 

31/01/2015 

15-03/2015

DONE

NTT
CEAM

 

D.B.2.2. Technical report related to manufacture and characterization of lab scale prototypes 

B 2 

28/02/2015 

01/01/2015 

DONE

 AITEX
 NTT

 

D.B.2.3. Prototypes of photocatalytic textiles developed at lab scale 

B 2 

28/02/2015 

31/07/2015 

DONE

 AITEX
 NTT

 

D.E.1.2 Inception Report (to be delivered within 9 months after the project start) 

E 1 

31/03/2015 

28/03/2015 

DONE

 CEAM

 

D.B.1.2 Final results of the air measurement (Six months reports with the updated results of the air measurements (chemical speciation, concentration profiles, etc.) 

B 1 

30/06/2015 

30/04/2016 

DONE

 CEAM

 

D.B.2.4. Technical report related to manufacture and characterization of semi-industrial scale prototypes 

B 2 

30/06/2015 

01/04/2016

DONE

 AITEX
 NTT

 

D.B.2.5. Prototypes of photocatalytic textiles developed at semi-industrial scale 

B 2 

30/06/2015 

15/04/2016

DONE

 AITEX
 NTT

 

D.D.1.1 Dissemination and Communication plan 

D 1 

31/10/2015 

31/10/2015 

DONE

 AITEX
ALL PARTNERS

 

D.D.1.2 Newsletter and dissemination material 

D 1 

31/12/2015 

31/12/2015 

DONE

 AITEX
ALL PARTNERS

 

D.B.3.1 Results report of 50% of photoactivity tests performed at EUPHORE 

B 3 

29/02/2016 

15/03/2016 

DONE

 

 

D.B.4.1. First nine months results report of demonstration tests in urban environments performed in Quart de Poblet 

B 4 

30/04/2016 

 31/03/2016

DONE

 

 

D.D.1.4 Dissemination material: leaflet, roll up banner 

D 1 

30/04/2016 

30/04/2016 

DONE

 

 

D.E.1.3 Mid Term Report (covering the first 18 months) 

E 1 

30/04/2016 

30/04/2016 

DONE

 CEAM

 

D.B.3.2. Results report of 100 % of photoactivity tests performed at EUPHORE 

B 3 

31/07/2016 

 

 

 

 

D.D.1.3 Newsletter and dissemination material 2016 

D 1 

31/12/2016 

21/12/2016 

DONE

 

 

D.D.1.5 Divulgation material (CD, pen drive or Agenda) 

D 1 

31/03/2017 

 

 

 

 

D. D. 3.1. Notice Board ( results of the project) 

D 3 

30/04/2017 

 

 

 

 

D.B.4.2. Final results report of demonstration tests in urban environments performed in Quart de Poblet 

B 4 

30/04/2017 

 

 

 

 

D.B.4.3. Technical protocol of use of photoactive textiles for the decontamination of urban environments 

B 4 

30/04/2017 

 

 

 

 

D.D.4.1 Layman's Report 

D 4 

29/06/2017 

 

 

 

 

D.C.1.1 Environmental Impact Report 

C 1 

30/06/2017 

 

 

 

 

D.C.1.2 Simple mathematic model 

C 1 

30/06/2017 

 

 

 

 

D.C.2.1.Socio-Economic Impact Report 

C 2 

30/06/2017 

 

 

 

 

D.E.1.4 Final Report (covering the whole project) 

E 1 

30/06/2017 

 

 

 

 

D.E.2.2: Report of the Final Event and the Final Meeting with the presentation of the result of the project and presentation of other LIFE projects. 

E 2 

30/06/2017 

 

 

 

 

D.E.3.1. After-LIFE communication plan in English and electronic format 

E 3 

30/06/2017 

 

 

 

 
 

LIFE PHOTOCITYTEX - Air pollution treatment in European urban environments by means of photocatalytic textiles. LIFE13 ENV/ES/000603. info@ceam.es